Superyacht Refit and Rebuild Facilities

KRM Yacht is a superyacht refit and rebuild shipyard in the Eastern Mediterranean, based in Tuzla, Istanbul. Our yard is in the Tuzla marine zone on the Anatolian side of the city, with a 900-ton travel lift, 40,000 m² of hard-standing and repair quays that take yachts to 110 metres.

The lifts, the hard-standing, the fixed and covered hangars and the workshops are all ours. A yacht is hauled out, worked on and redelivered by our own people, on our own blocks and quays. Refit and rebuild is all we do. The yard was built for that one kind of work.

KRM Yacht is the first Turkish member of the ICOMIA Superyacht Refit Group, and as of 2026 still the only one. Our management systems are certified by LRQA to ISO 9001, ISO 14001 and ISO 45001. In 2023, captains and crew voted KRM the Best Superyacht Refit Yard at the Superyacht Business Awards by ACREW.

900 tons

CIMOLAI Travel lift, the largest in Türkiye, lifts yachts to 70 metres. Above that, the yard period runs afloat at the repair quays.

40,000 m²

Hard-standing that holds up to 50 yachts ashore.

110 m

Maximum length alongside. The repair quays take up to 15 superyachts.

3,500 m²

Workshops inside the yard, with a further 800 m² of storage.

Ashore, 40,000 m² of hard-standing holds up to 50 yachts. Alongside, the repair quays take up to 15 superyachts, to 110 metres. A yacht too heavy for the lift works afloat there through her yard period. Yachts ashore and alongside take shore power and fresh water from the yard. Waste goes off through our connection, and the gate is manned. Send us her LOA, beam, draught and lifting displacement, and we will confirm whether she comes ashore or works afloat before you commit to dates.

Painting Under Cover, in Controlled Temperature and Humidity

Every full repaint runs under cover, in a climate-controlled space. If one of our fixed or covered hangars is free and suits her size, she goes inside. If not, our team builds a hangar around her on the hard, so she does not wait for one. We confirm which hangar she goes into once we have her LOA, beam and air draught.

In both, we hold the temperature and humidity that the paint manufacturer specifies for the coating. Surface preparation, fairing and spraying are done by our own painting team.

Before and during spraying, the team logs temperature and humidity readings and checks dry film thickness as the coats build. Inspection is carried out by FROSIO-certified personnel. You receive the coating record at handover, so you can check the readings for every coat.

Because the work is under cover, rain and cold do not stop a repaint in an Istanbul winter.

For how a full repaint runs from preparation to topcoat, see our superyacht painting service.

3,500 m² of Workshops

Our workshops cover 3,500 m², with a further 800 m² of storage. They stand beside the hard-standing, so a pump, a hatch or a run of panelling comes off the yacht, goes straight onto a bench in our own workshop and goes back on board. Carpentry, metalwork, piping, paint and interior joinery are our own people on our own benches, so we set the order of the work ourselves. More than 300 marine professionals work across the yard and the workshops.

Interior Production Workshop

We make the interior joinery in our own 2,000 m² workshop at Darıca, our second site. Panels, furniture and fitted joinery are machined on 3-axis and 5-axis CNC, veneered and finished on the bench, then taken to the yacht and fitted. Upholstery is sewn in the same workshop as the joinery, so the panels, the furniture and the covers for one cabin are finished together.

We make the interior joinery in our own 2,000 m² workshop at Darıca, our second site, about 15 minutes from the yard.

2,000 m²

INTERIOR PRODUCTION
WORKSHOP

3- and 5-axis

CNC
machining

In-house

veneer, upholstery
and finishing

Mock-up / pre-fit

PRE-FIT, DELIVERY AND
ONBOARD INSTALLATION

Our Superyacht Interior Manufacturing page shows the machines, the benches and the fitting out on board.

Location

Most yachts arrive between October and April, coming off the Mediterranean season. A winter yard period at Tuzla puts her back in the cruising grounds for spring, a short transit from the Aegean and the East Mediterranean.

Frequently Asked Questions

1Can you lift a 60 metre steel motor yacht?
It depends on her lifting displacement, not her length. Our 900-ton travel lift takes yachts to 70 metres, within a maximum beam of 10 metres and a maximum draught of 5.5 metres. A 60 metre steel motor yacht can be at or above the 900-ton limit once tanks, machinery and stores are counted, so we work from her lifting displacement rather than her LOA. Send us her LOA, beam, draught and lifting displacement, and we will confirm the lift before dates are agreed. Above lift capacity, the yard period runs afloat at the repair quays, which take vessels to 110 metres.
2Can a full repaint run through the winter?
Yes. Full repaints run under cover in controlled temperature and humidity, so the Istanbul winter does not sit on the critical path of a repaint. She goes into one of our fixed or covered hangars if one is free and suits her size. If not, our team builds a climate-controlled hangar around her on the hard.
3How many yachts can the yard hold at one time?
The hard-standing covers 40,000 m² and holds up to 50 yachts, and the repair quays take up to 15 superyachts alongside, to 110 metres. Capacity is never the reason a job waits.
4Is there space at the yard for our own surveyor or owner's representative?
Yes. Independent supervision is welcome. We can provide working space at the yard for a surveyor or an owner's representative, with access to the project records. A reporting routine is agreed with your side at the start of the period. Where your team prefers to run its own inspection regime, we plan the hold points around it.

Discuss the Next Yard Period with KRM Yacht

A refit quotation starts with three things: her main dimensions and lifting displacement, the worklist as it stands today, and the weeks you want her back in service. Send those to our project team through the quote form. Our project team reads the worklist, tells you what we would want to survey on board, and comes back with a first read on the work and the weeks. The quotation and the schedule to redelivery follow once she has been surveyed and the worklist is agreed.